What is the Battery Introduction Promotion Project? How to apply and an overview of each project explained!
Updated: July 2026, 6

Project to promote the introduction of storage batteries in households (storage batteries)

This is a system that subsidizes a portion of the cost for those who install a storage battery system in their residence in Tokyo.
This project applies to both new and existing homes.
Application acceptance period (8)
Pre-registration:Starts May 8, 5!
Grant application and performance report:Scheduled to start on June 30, 2026
Subsidy
| New installation of battery storage system | Storage capacity (kWh) x 10 yen (subsidized expenses (excluding tax) are the upper limit) |
| Adding storage battery units | Storage capacity (kWh) x 6 yen (subsidized expenses (excluding tax) are the upper limit) |
*The above formula is the basis for calculating the subsidy amount, and there are many other additional factors.
*Expenses covered by the grant: Equipment costs (costs required for purchasing facilities and equipment, etc.) + construction costs (excluding consumption tax)
Main requirements for the target device
① The equipment must be eligible for subsidy and newly installed in a home within Tokyo.
② The subsidized equipment must be installed between April 1, 2026 and March 30, 2029.
③ It must be registered with "SII".
④ The equipment eligible for the subsidy must not have received any other similar subsidies from the Tokyo Metropolitan Government or the public corporation.
(For example, the Zero Emissions application being implemented by Coolnet Tokyo)
Target person
- Owner of the subsidized device
Equipment eligible for assistance
◆Environmental Co-Creation Initiative (SII)Must be registered by.
◆Equipment costs per 1kWh of storage capacity may be specified.
◆There may be a specified period for installing the storage battery.
*Excerpt from Cool Net Tokyo “Application Guide”
Required documents for advance application
| Document | Description |
| Quotation | ・The address of the location where the target equipment will be installed must be clearly stated. ・The name of the grant applicant must be stated in the "Recipient (Orderer)" field. ・The package model number or unit model number or IoT device model number of the target equipment must be accurately stated. ・The price of the target equipment (equipment cost and installation cost only. Consumption tax and miscellaneous expenses not included) must be clearly stated. ・If a public corporation-style quotation is used, the date of issue, name of the issuing company, and issuing company seal must be included. |
* The above documents are required for advance application.
We will inform you of the documents required for the grant application and performance report after your advance application.
Call us
06-6442-3915(Weekdays 9 hour to 18 hour)


![What is Coolnet Tokyo's solar power business? We explain the application process and an overview of each business! [For restaurant chains] (17)](https://www.shigyo.co.jp/cms/wp-content/uploads/2025/07/085ff3bf9003c636ab948a54b55d1aa4-1-150x150.png)

![What are high-insulation windows, high-insulation doors, insulation materials, and bathtubs? We explain the application process and the outline of each project! [For restaurant chains] (20)](https://www.shigyo.co.jp/cms/wp-content/uploads/2025/07/3eea8d5aeeae33099a00265d68974c56-150x150.png)