What is the Home Energy Conservation 2026 Campaign? An overview!
Updated: July 2026, 6
This is based on information as of November 28, 2025.
There may be changes.
For the latest information, please check the following website.
Housing Energy Saving 2026 Campaign
*Please check the official website for the latest information.
Overview of the Home Energy Saving Campaign 2026
The Home Energy Saving Campaign consists of the following four projects:
- Mirai Eco Housing (Renovation/New Construction)
- Advanced Window Renovation 2026 Project
- Hot Water Energy Conservation 2026 Project
- Rental Housing Hot Water Energy Saving 2026 Project
budget
The budget has been declining since 2025.

Mirai Eco Housing
[New Construction
■ Budget
Long-term quality housing/ZEH standard housing
1,450 billion yen (Ministry of Land, Infrastructure, Transport and Tourism)
GX-oriented housing
750 billion yen (Ministry of the Environment)
■ Eligible housing and subsidy amount

*1 When applying for "New Construction (GX-oriented housing, long-term excellent housing, ZEH-standard housing)" under this program, we require the construction company of the housing to "declare its commitment to promoting efforts to secure skilled workers." For details, please see below.CLICK HERE
*2 Based on the "regional classification" under the Act on the Improvement of Energy Consumption Performance of Buildings (Act No. 53 of 27). For details, see below.CLICK HERE
*3 When a house owned by the builder (including their relatives) is demolished in conjunction with the construction of a new house.
*Limited to houses built by businesses that have expressed their cooperation with 4GX. For details, see below.CLICK HERE
Regarding "GX-oriented housing" specifically "detached houses," the maximum number of units that each registered business operator can apply for is generally 300 units per month (standard quota).
Furthermore, an additional 300 units per month (separate allocation) can be applied for housing units that are subject to initiatives contributing to the promotion of advanced GX (Geographical Innovation).
Please note that the separate allocation will only be granted to businesses that the secretariat approves of using that allocation. For details, please see below.CLICK HERE
*5 For new construction of rental housing (limited to long-term excellent housing or ZEH-standard housing), the subsidy covers 50% of the number of rental units that meet the requirements. Furthermore, to streamline administrative procedures, the subsidy amount in the application process will be handled as follows.
Long-term high-quality housing: 400,000 yen per unit for regions 1-4, and 375,000 yen per unit for regions 5-8.
ZEH-standard housing: 200,000 yen per unit for regions 1-4, and 175,000 yen per unit for regions 5-8.
■Application requirements
Projects for which foundation work commenced on or after November 28, 2025.
Changed from "Target construction work" to "Foundation work".
*Please note that while the "Child-Rearing Green Housing Support Project" implemented in FY2025 targeted "construction work after foundation work," the "Future Eco Housing 2026 Project" has changed this to "foundation work."
For GX-oriented homesおいて
from now on,Houses for which the building permit application was submitted on or after July 1, 2026In
The "HEMS controller" must have obtained a compliance label of JC-STAR★1 or higher.This applies even if the house installing the solar power generation system includes components that perform IP communication (power conditioner, remote control, etc.).The device must have obtained a JC-STAR★1 or higher compliance label; this is a mandatory requirement.will do.
■Issue application period
From May 13, 2026 to December 31, 2026 at the latest (or until the budget limit is reached).
*For new custom-built homes (limited to ZEH-standard homes), the application deadline for subsidies will be until the budget limit is reached (no later than September 30, 2026).
■ Reservation period for grant application
November 13st, 2026 ~No later than November 16, 2026 (or until the budget limit is reached).
*For new custom-built homes (limited to ZEH-standard homes), the reservation period is until August 17, 2026 at the latest. (If the budget limit is reached, it will be until that time.)
■Completion Reporting Period

*The number of floors includes the basement of the building.
[Renovation]
2026November 30stWe will now begin accepting applications (including reservations) for renovation subsidies.
■ Budget
300 billion yen (Ministry of Land, Infrastructure, Transport and Tourism)
Starting this year,The target house is specified as follows:It was done.

■ Subsidized construction projects
① Insulation improvements for openings
② Insulation renovation of the building structure
③ Installation of eco-friendly housing equipment
④ Childcare-friendly renovations
⑤Renovations to improve disaster prevention performance
⑥ Barrier-free renovations
⑦ Installation of air conditioners with air purification and ventilation functions.
⑧ Enrollment in renovation defect insurance, etc.
■Application requirements
The target construction work began on or after Friday, November 28, 2025
■Issue application period
Applications will be accepted from the start of the application period until December 31, 2026 at the latest (or until the budget limit is reached).
■ Reservation period for grant application
Applications will be accepted from the start of the application period until December 16, 2026 at the latest (or until the budget limit is reached).
■ Eligibility Requirements
If the owner or other party contracts with a Mirai Eco Housing business operator and carries out renovation work that meets certain requirements, subsidies are available depending on the scope of the renovation.
Eligible persons
Those who meet the following two conditions are eligible.
①Those who enter into a construction contract with a Mirai Eco Housing business operator and carry out renovation work.
A "Future Eco Housing Business Operator" is a company that acts on behalf of the construction client to handle procedures such as grant applications.
These are construction contractors who have registered with this program in advance, as they are responsible for returning the subsidies they receive to the clients who commission the construction work.
②The person must be the owner of the house to be renovated.
Homeowner:
Individuals or their families who own and reside in a house
Individuals or corporations that own and rent out residential properties
賃借人
Management associations and management corporations for apartment buildings, etc.
Target housing
Houses built before 28
Target period
Construction commencement period: November 28, 2025 - no later thanUntil February 2026, 12(If the budget limit is reached, it will be until that point.)
Requirements for eligible renovation work
In this project, renovation work will be broadly categorized into two types: "required work" and "subsidized work."
①Construction work required to receive subsidies (required construction work)
There are two criteria for "compulsory construction work": combinations to comply with "mandatory standards" and combinations to comply with "next-generation energy-saving standards." Details of the combinations for "compulsory construction work" are shown in the table below.
Obligatory standards

Next-generation energy-saving standards

*1 Houses built before 1991 (Heisei 3) are particularly in need of performance improvements, and therefore, the necessary combinations of construction work are specified for each period of construction.
Quoted from the Housing Energy Conservation 2026 website.
②Construction work required to calculate the subsidy amount (eligible construction work)
When a requirement-based construction project is carried out in a trigger room, the renovation work carried out in that house is,
Construction work that meets certain conditions is called "subsidized construction work."
The subsidized construction work includes not only work carried out in the trigger room, but also other renovation work carried out in the target residence.
The specific types of construction work and conditions eligible for subsidies are as follows:

Quoted from the Housing Energy Conservation 2026 website.
Subsidy
The total amount of subsidies determined for each eligible construction project.
Subsidy upper limit

Quoted from the Housing Energy Conservation 2026 website.
■Application procedure flow
①Get an account for the Home Energy Saving Portal
All procedures for this project will be conducted through the "Residential Energy Saving Portal," a web system provided by the secretariat. To use the portal, you will need to obtain either a "General Account" or a "Responsible Person Account," depending on your purpose and the user.

Quoted from the Housing Energy Conservation 2026 website.
②Registered as a Mirai Eco Housing Business Operator
A Mirai Eco Housing Business Operator is a construction contractor or similar entity registered with the secretariat to handle the application process for subsidies on behalf of eligible applicants, receive the subsidies, and return the received subsidies to the eligible applicants. Mirai Eco Housing Business Operators are registered with the Housing Energy Saving 2026 Campaign by declaring their participation in this program.
The procedure must be carried out by the user of the central account via the portal, and the following documents must be submitted.

Quoted from the Housing Energy Conservation 2026 website.
*Outputs or screenshots from the registration information service are also acceptable.
③Publication of registered businesses (campaign website)
Businesses registered for the campaign, including Mirai Eco Housing businesses, will be publicly listed on the campaign website if they so wish.
Public disclosure will require addressing inquiries from sales offices and consumers.
4Conclusion of construction contract
This applies to renovation projects for which a construction contract was signed before construction began.
*When construction work is divided and awarded to multiple contractors for renovation work (separate contracting), applications can only be submitted if one of the construction contractors submits the application on behalf of the other contractors.
⑤Conclusion of Joint Project Implementation Agreement
When utilizing the subsidies for this program, the Mirai Eco Housing business operator and the construction client will agree in advance on the following items using the "Joint Project Implementation Agreement" form designated by the secretariat.

Quoted from the Housing Energy Conservation 2026 website.
⑥Commencement of construction
Renovation work for which a construction contract has been signed and commenced on or after November 28, 2025, is eligible for the subsidy.
Please be sure to take photos before construction begins. (If you forget, you will not be eligible for the subsidy.)
*If you are undertaking insulation renovations on the building structure, please be sure to take photos during the construction process.
⑦Reservation for grant application
What is a grant application reservation? It means reserving (reserving) the planned grant amount for a certain period of time for a subsidized project (renovation) for which grant payment is expected.
The user with the assigned account will complete the procedure through the portal for this project.
Please note that making an appointment to apply for the grant is optional. Whether or not you make an appointment to apply for the grant is up to you.Based on the budget execution status, please make your decision at your own responsibility as a Mirai Eco Housing business operator.
Application reservation period: From the start of application acceptanceBy November 16, 2026 at the latest(If the budget limit is reached, it will be until that point.)
Note: The validity period of the application reservation is,No later than December 31, 2026, or three months from the date of submission, whichever comes first.This applies if the reservation period expires, if the reservation application is rejected, or if an application is submitted after the reservation has been made. However, even if the reservation has expired, you can make a new reservation or apply for the grant again within the application period.
Required documents

*1 In the case of separate contracts, construction contracts with all contractors.

Quoted from the Housing Energy Conservation 2026 website.
Mirai Eco Housing 2026 Joint Project Implementation Regulations [For Renovation] Designated Form
https://mirai-eco2026.mlit.go.jp/assets/doc/miraieco_youshiki_3-2.pdf
⑧Completion and handover of construction work
We will complete all subsidized construction work under the concluded construction contracts and hand it over to the client.
Please be sure to take photos after the construction is complete. (If you forget, you will need to take photos at a later date.)
⑨Application Approved
Application acceptance period: From the start of application acceptanceBy November 31, 2026 at the latest(If the budget limit is reached, it will be until that point.)
Required documents


- *1 In the case of separate contracts, construction contracts with all contractors.
- *2 To ensure that the entire interior of the Trigger Room can be seen, please take photos that include all interior walls, including the ceiling, making sure the entire wall surface is visible.
Details regarding filming procedures and other important information will be announced at a later date.
Quoted from the Housing Energy Conservation 2026 website.
Mirai Eco Housing 2026 Joint Project Implementation Regulations [For Renovation] Designated Form
https://mirai-eco2026.mlit.go.jp/assets/doc/miraieco_youshiki_3-2.pdf
⑩Issuance decision
The secretariat will approve the grant to the Mirai Eco Housing Business Operator, the grant recipient, if there are no deficiencies in the submitted grant application. The grant approval will be notified to the user of the contact person's account on the project's portal.
⑪Performance report (and invoice) / Confirmation and disbursement (bank transfer) of subsidy amount
If the grant decision is not withdrawn or revoked by the "withdrawal deadline" stated in the grant decision notice, the project performance report (and claim for the grant) will be treated as having been submitted.
Based on the performance report, the subsidy amount will be determined and then transferred to the account designated by the Mirai Eco Housing business operator. (The deadline is the 20th of the current month, and payment is scheduled for the end of the following month.)
Furthermore, the final subsidy amount and the scheduled payment date will be notified to the Mirai Eco Housing business operator and the joint venture partner, the construction client.
⑫Subsidy rebate
The Mirai Eco Housing business operator will return the granted subsidy to the construction client in the manner agreed upon by both parties in step ⑤.
Advanced Window Renovation 2026 Project
The subsidy targets have been expanded to include "residential buildings and some non-residential buildings," making non-residential buildings eligible.
However, details about "some non-residential properties" have not been announced at this time.
<Changes from 2025>
- Extra large size added
・Interior windows grade A are excluded from subsidy eligibility
・Review of subsidy unit prices
*Updated as of December 16, 2025
*2026November 30stWe will now begin accepting applications (including reservations) for renovations (non-residential) for subsidies.
Application reservation acceptance period
From May 30, 2026 to December 16, 2026 at the latest (or until the budget limit is reached).
Application acceptance period
From May 30, 2026 to December 31, 2026 at the latest (or until the budget limit is reached).
■ Subsidy amount
Maximum 100 million yen/unit

■Subsidy target
- Projects that begin on or after Friday, November 28, 2025, and are to be completed by December 31, 2026.
- Residential and somenon-residential building
*In principle, windows (glass) and doors of buildings and rooms that fall under the following categories are not eligible for subsidies as residential buildings.
① In real estate registration and property taxation, it is classified as a use other than residential.
② (Even if ① is a residence) It is currently being used for purposes other than residential use (such as a shop or facility). - Insulation renovation work to install high-insulation windows (those that exceed the 2030 target standard for the Building Materials Top Runner Program, such as a heat transmission coefficient of Uw 1.9 or less, or meet other requirements)
- If doors (limited to those installed in openings) are also renovated to have higher insulation performance within the same contract as window renovations, they will be eligible for subsidies.

(Examples of eligible projects)

Hot Water Energy Conservation 2026 Project
Percentage of budget to be applied for grant
24% As of June 23, 2026, 0:6
■ Subsidy amount

■ Budget
570 billion yen (FY7 supplementary budget)
■Subsidy target
Businesses that install high-efficiency water heaters in the following types of residences, regardless of whether they are detached houses, apartment buildings, etc.* 1 * 2

*1 Excludes projects that received subsidies under the Hot Water Energy Saving 2025 Project.
*This applies only to businesses that express their intention to participate in the 2J-Credit scheme.
*3 Buy-and-resell businesses are not eligible. Also, projects where the client purchases the water heater and then hires a contractor to install it (so-called owner-supplied or material-and-labor separation projects) are not eligible for subsidies.
*4 If the seller replaces the water heater in the purchase of an existing home, the buyer will be eligible for the subsidy.
(This must be verifiable in the real estate sales contract or its special provisions.)
Please note that purchasing an existing home that already has unused eligible equipment installed will not qualify for the subsidy, as it will not be considered a replacement of the equipment.
*5 The leases eligible for subsidies under this program are:CLICK HERE.
■Start date of construction and application period for subsidy
Purchase/Installation Type

*1 If you are building a new custom-built house by contracting with multiple contractors (separate contracts), the date of commencement of construction is "the construction start date of the construction contract that includes the installation of the subsidized product (first unit)."
Lease type

■ Target period
Contract period: Before the start date of construction
Construction start period: After November 28, 2025
Grant application periodApplication period: From the start of application acceptance until the budget limit is reached (no later than November 31, 2026)
Reservation period for issuance applicationApplication period: From the start of application acceptance until the budget limit is reached (no later than November 16, 2026)
We have started accepting applications (including reservations) for grants for apartment buildings and similar properties in bulk.
The Hot Water Energy Saving 2026 project began accepting applications (including reservations) for bulk grants for apartment buildings and other similar properties from 10:5 AM on May 29, 2026.
■About the changes
By lowering the subsidy amount, we aim to increase the number of units supported. (Shift to "high-performance equipment with DR function (requirements A and C)" and "equipment with even higher energy-saving performance (requirements A + B)").

Rental Housing Hot Water Energy Saving 2026 Project
■ Budget
35 billion yen (FY7 supplementary budget)
■Subsidy target
Regarding the existing rental apartment units that are subject to this rule,
A project to replace conventional water heaters with subsidized, compact, energy-saving water heaters (Eco-Jaws/Eco-Feel).
(Including the use of leasing)
■ Subsidy amount
Small, energy-saving water heater
(Eco-Jaws/Eco-Feel)
With reheating function: 7 yen/unit
No reheating function: 5 yen/unit
■ Additional amount
| Reheating function | Construction work eligible for additional payment | Subsidy amount (additional amount) |
| None | Cross the common corridor Drainage guide installation work | 3 yen/unit |
| drop-off service | Bathroom drainage work (Three-way valve installation, three-pipe (including double-pipe) installation) | 3 yen/unit |
■Application Category and Registered Business Operator

■Start date of construction and application period for subsidy

*1 Installation work includes the removal of the conventional water heater.
■ Target period
Contract period: Before the start date of construction
Construction start period: After November 28, 2025
Grant application periodApplication period: From the start of application acceptance until the budget limit is reached (no later than November 31, 2026)
Reservation period for issuance applicationApplication period: From the start of application acceptance until the budget limit is reached (no later than November 16, 2026)
Application flow
- I want to apply, but I want to minimize the time and effort required for the process so I can focus on my main business.
- There are so many documents to submit when applying (such as photos), I don't know if they are all correct.
- There is no time to take additional measures such as dealing with incomplete application documents
- Schedules such as application timing become complicated and difficult to manage
- We handled the procedures for the Home Energy Conservation 2025 Campaign in-house, but are looking for an agent to continue the campaign.
Benefits of requesting
- Reduce the burden of applying for subsidies within your company
- Thorough deadline management
- Services tailored to the scale of your business
- Subsidy applications can also be accepted
- Fast Response



![[Breaking News] Overview of the 2026 Housing Energy Saving Campaign and the 2026 Future Eco Housing Project Screenshot 2026-04-14 152712](https://www.shigyo.co.jp/cms/wp-content/uploads/2026/04/108d5b675e7ae036d2de8f4ee9a700f1-150x150.png)


