Non-residential subsidies

Trucking Energy Conservation Promotion Project

Updated: July 2026, 5


Application assistance service for subsidies related to promoting energy conservation in truck transportation.

By utilizing this subsidy, truck operators, shippers, and leasing companies can primarily benefit from two advantages: financial assistance for system and vehicle introduction costs, and cost reductions (fuel costs) through improved operational efficiency.

Since information for fiscal year 8 has not yet been released, the information provided is for fiscal year 7.
As of May 8, 5

Subsidy overview

Project implementation scheme

Subsidized business

This project requires collaboration between truck operators and shippers, etc., and will subsidize a portion of the costs required to implement the following subsidized items 1 and 2.

1. Vehicle tracking system, reservation system, etc., loss planning system, and AI/IoT-based system integration tools

Two double-trailer trucks and swap body container vehicles

Subsidized businesses

Businesses eligible for the subsidy are those that fall under any of the following categories "A" through "E". Depending on the system or vehicle to be introduced, it may be possible to apply individually or only through a joint application.

1. Categories of businesses eligible for subsidies

  • a. Freight trucking operators
  • I. Type 2 freight forwarding business operator
  • (c) Private truck operators
  • E. Shippers, etc.(Consignor, Consignee, Prime Contractor)
  • O. Leasing company

2. Application requirements for each type of application (individual application/joint application)

The requirements vary depending on the system and vehicle type, as follows:

  • Reservation system / Vehicle dispatch planning system
    • A, I, U, EBoth individual and joint applications are possible.
    • OhJoint applications only are accepted.
  • Vehicle tracking system + reservation system or dispatch planning system / Double-trailer trucks / Swap body container vehicles
    • A, I, UBoth individual and joint applications are possible.
    • E.O.Joint applications only are accepted.
  • AI/IoT-based system integration tools
    • A, I, UBoth individual and joint applications are possible.
    • EhOhJoint applications only are accepted.

Subsidy

Vehicle movement management system

Maximum subsidy amount: per unit14 million yen(Maximum of 30 units per business)
Subsidy rate: Fixed amount (within 1/2)

Reservation system, etc. (reservation acceptance, ASN, pre-order information confirmation, pallet management, etc.)

Maximum subsidy amount: per business4,000 million yen
Subsidy rate: Fixed amount (within 1/2)
*This initiative requires at least 5 vehicles.

Reservation system, etc. (palletizing system)

Maximum subsidy amount: per business5,000 million yen
Subsidy rate: Fixed amount (within 1/2)
*This initiative requires at least 5 vehicles.

Vehicle dispatch planning system

Maximum subsidy amount: per business4,000 million yen
Subsidy rate: Fixed amount (within 1/2)
*This initiative requires at least 5 vehicles.

AI and IoT-based system integration tools

Maximum subsidy amount: per business5,000 million yen
Subsidy rate: Fixed amount (within 1/2)

Double-trailer truck

Maximum subsidy amount: per unit1,000 million yen(Up to 10 units per business)
Subsidy rate: Fixed amount (up to 1/2 or up to 1/3)

Swap Body Container Vehicle

Maximum subsidy amount: per unit1,000 million yen(Maximum of 10 vehicles per business. Maximum of 3 cargo beds per vehicle.)
Subsidy rate: Fixed amount (up to 1/2 or up to 1/3)

Application acceptance period

First public call: July 4, 2020 (Friday) 10:00 to July 14 (Monday) 16:00  Finish
Second public call: July 28, 2020 (Monday) 10:00 to August 8 (Friday) 16:00  Finish
Third public call: Friday, August 29, 2020, 14:00 to Monday, September 8, 16:00   Finish

Do you have this problem?

  • The requirements are complex, and I'm not sure if my company is eligible.
    It is difficult to determine whether the detailed system requirements are being met.
  • I don't have time to compile data or create documents.
    I don't have time to do the complex calculations and create the large volume of paperwork.
  • I'm worried about the procedures using the electronic application system.
    This subsidy generally requires all applications to be uploaded through a dedicated electronic application system, and some people may be unsure about PC work or account registration.
  • I want to avoid being rejected due to incomplete paperwork.
    Delays in project completion due to incomplete application documents or insufficient prior coordination will not be tolerated; meticulous schedule management is required.

Benefits of requesting

Clearing complex grant requirements and rules

Experts specializing in complex requirements and local government-specific rules will provide timely assessments and advice to ensure compliance with stringent requirements.

Support from application to project completion.

We provide continuous support for long-term administrative procedures, from document creation to post-event reporting, significantly reducing the burden on the person in charge.

Leave the complicated procedures to others and concentrate on your core business.

By entrusting time-consuming tasks such as account creation, electronic applications, and document preparation to us, your staff can focus on their core responsibilities.

Subsidy application assistance process

  • 1

    Gathering required documents
    After you apply, our specialized staff will guide you through the necessary documents for the grant application. If you have any problems with collecting documents, etc., you can contact us anytime during business hours.
  • 2

    Interview (phone, ZOOM, etc.)
    In order for us to create a business plan, we will need to meet with you for about 30 minutes to an hour.
  • 3

    Creating a business plan
    Our specialized staff will create a draft business plan for you to pass the selection process, and we will ask you to confirm the contents.
  • 4

    Application
    After entering the information in the application portal, you will submit your application.
  • 5

    Announcement of selection
    The results will be announced after the application deadline.

Reward table

Support contentRemuneration amount (tax included)
Preparation and submission of application documentsFrom 200,000 yen/item

*The amount of compensation will vary depending on the amount of grant approved.

    Free consultation available!
    Contact Us
    Free consultation available!
    Contact Us