[SII] FY7 Supplementary Budget Energy Conservation and Non-Fossil Fuel Conversion Subsidy (Equipment Unit Type)
Updated: July 2026, 6
table of contents
[SII] FY7 Supplementary Budget Energy Conservation and Non-Fossil Fuel Conversion Subsidy (Equipment Unit Type) Application Assistance Service
Subsidy overview
By utilizing this subsidy, large corporations, small and medium-sized enterprises, and sole proprietors operating in Japan can receive up to 5 million yen in financial assistance when introducing highly efficient energy-saving equipment, and can also significantly reduce their monthly energy costs after installation.
Eligible project categories, subsidy rates, and maximum amounts.
The application is divided into the following categories depending on the nature of the project being applied for.
- (III) Equipment Unit Type [Conventional Frame]
- Contents: Upgrade to "designated equipment" that meets the standards set by SII.
- Eligible expenses: equipment cost
- Target equipment:Specified equipment
- Update/New Establishment:renew
- Application requirements: Businesses that meet any of the following requirements
① Energy saving rate: 10% or more
② Energy saving amount: 1 kl or more
③ Energy savings per unit of expense: 1 kl/10 million yen or more - Subsidy rate: Within 1/3
- The maximum amount:"Maximum amount" 1 million yen / entire project
"Minimum amount" 30 yen
- (III) GX Equipment Unit Type [Manufacturer Reinforcement Framework]
- Contents: In addition to the requirements of the conventional framework, this involves upgrading to "designated equipment" manufactured by manufacturers that meet the GX requirements.
- Eligible expenses: equipment cost
- Update/New Establishment:renew
- Application requirements: Businesses that meet any of the following requirements
① Energy saving rate: 10% or more
② Energy saving amount: 1 kl or more
③ Energy savings per unit of expense: 1 kl/10 million yen or more - Subsidy rate: Within 1/3
- The maximum amount:"Maximum amount" 3 million yen / entire project
"Minimum amount" 30 yen
- (III) GX Equipment Unit Type [Top Performance Category]
- Contents: This involves updating or installing new equipment that meets the even higher "top performance standards" among the equipment from manufacturers that already meet the GX requirements.
- Eligible expenses: equipment cost
- Target equipmentDesignated equipment (high-efficiency air conditioning, industrial heat pumps, high-performance boilers, low-carbon industrial furnaces, industrial motors)
- Subsidy rate: For renewals, the cost is within 1/2; for new installations, it is within 1/5.
- Update/New Establishment:renew
It must meet one of the energy-saving requirements.
① Energy saving rate: 10% or more
② Energy saving amount: 1 kl or more
③ Energy savings per unit of expense: 1 kl/10 million yen or more
Newly established
This project involves introducing top-performance equipment that is even more energy-efficient than standard equipment or conventionally designated equipment. - The maximum amount:"Maximum amount" 3 million yen / entire project
"Minimum amount" 30 yen
- (II) Electrification and decarbonization fuel conversion type
- Contents: This includes upgrading designated facilities to ones that convert from fossil fuels to electricity or low-carbon fuels, modifying existing facilities to be capable of hydrogen combustion, and constructing new facilities that can utilize hydrogen fuel.
- Eligible expenses: Equipment costs, construction costs (construction costs are only applicable to small and medium-sized enterprises or hydrogen conversion projects)
- Subsidy rate: For updates and modifications, the cost is within 1/2; for new installations, it is within 1/5.
- The maximum amount: 3 million yen (5 million yen for projects involving electrification)
- (IV) Energy demand optimization type
- Contents: This project involves introducing an Energy Management System (EMS) registered with SII to effectively reduce energy consumption. *This project cannot be applied for independently; it must be combined with either (III) or (II).
- Eligible expenses: Design cost, equipment cost, construction cost
- Subsidy rate: Small and medium-sized enterprises (SMEs) should limit their spending to 1/2, while large enterprises should limit their spending to 1/3.
- The maximum amount:"Maximum amount" 3 million yen / entire project
"Minimum amount" 30 yen


Recruitment period
First public offering
Monday, June 1, 2026 - Thursday, July 9, 2026 *Must arrive by 17:00
The grant decision is scheduled for early September 2026.
Public tender for energy management operators (3rd round of tenders)
Monday, March 1, 2026 - Monday, April 15, 2026 *Must arrive by 17:00
The planned release date is late July 2026.
Overall schedule for the second round of applications

Do you have this problem?
- I don't know which application category is best suited for my company.
There are so many categories—conventional, manufacturer-reinforced, top-performance, etc.—that it's hard to decide. - The application forms are enormous, and I'm too busy with my main job to handle them all.
I want to delegate schedule management so I can focus on my core work without being overwhelmed by the sheer volume of paperwork. - I want it to be accepted, but I'm afraid of being rejected due to a mistake.
I want to avoid the risk of being disqualified from the review process due to minor document errors or calculation mistakes.
Benefits of requesting
Managing a massive amount of paperwork and a tight schedule.
By having our firm manage the extensive paperwork, the organization of drawings, and the strict deadlines for mailing, our clients can focus on their core business.
Diagnosis and proposal of the optimal "application framework" and "equipment requirements" for your company.
We offer optimal proposals tailored to your plans and company size, including options such as "conventional framework" and "top-performance framework." We also provide support in confirming equipment that meets your requirements (designated equipment, etc.).
Addressing complex requirements
We keep up with complex requirements and the latest information, and we provide comprehensive support for the most up-to-date application requirements that require specialized knowledge.
Follow-up from grant approval to project completion (results report)
Even after your project is selected (grant approved), we will reduce your administrative burden over the long term, from preparing performance reports to submitting the mandatory "results report" after the subsidy is disbursed.
Process to receive subsidy
Applicants who wish to utilize subsidies request construction work from a construction company, and the construction company then applies to our company. (See diagram below)
Therefore, customers can use subsidies as a sales tool to make proposals to applicants (orderers).

Overall schedule


Quote:SII business brochure Than
Reward table
| Support content | Remuneration amount (tax included) |
| Preparation and submission of application documents | From 200,000 yen/item |
*The amount of compensation will vary depending on the amount of grant approved.
◆Available nationwide




![[SII] FY7 Supplementary Budget Energy Conservation and Non-Fossil Fuel Conversion Subsidy (Factory/Business Establishment Type) image](https://www.shigyo.co.jp/cms/wp-content/uploads/2026/06/image-6-150x150.png)
![[SII] Subsidy to promote upgrading to energy-saving equipment Housing subsidies](https://www.shigyo.co.jp/cms/wp-content/uploads/2022/11/top_sec1_img011.png)

